High-density data center with liquid cooling infrastructure
Blackwell-Ready Infrastructure

The 132kW Barrier.

Securing institutional, liquid-cooled infrastructure for the Blackwell era across the SingaporeLondonGCC axis.

Scroll
Data center construction site

Capacity Dashboard

Real-time infrastructure status across our global facility network.

LIVE
Liquid cooling infrastructure
Technical Specifications

Built for the Blackwell Era

Every facility engineered from the ground up for next-generation AI compute density.

Density

120kW–150kW

per rack

Purpose-built for GB200 NVL72 configurations. No compromises.

Cooling

Integrated

Liquid-to-Liquid CDUs

Direct-to-chip cooling with rear-door heat exchangers. PUE < 1.15.

Structural

2,100

kg/sqm floor loading

Reinforced foundations for high-density GPU clusters and battery systems.

Sovereignty

Private

pods with chain-of-custody

Dedicated cages, biometric access, and full physical chain-of-custody audit trails.

<1.15
Target PUE
2N+1
Redundancy
400G
Network
Q2 2026
Deployment
Global Presence

The SGP—LON—GCC Axis

Strategic positioning across three continents for low-latency inference, data sovereignty compliance, and diversified infrastructure risk.

SingaporeSGPAPAC Hub

Strategic gateway to Southeast Asia's AI ecosystem

LondonLONEMEA Hub

Financial and enterprise AI center for Europe

GCCBAHEmerging

Sovereign AI infrastructure for the Gulf region

CryoDC high-density data center interior
SGP-Loyang Facility

Power Secured

Long-term power agreements at competitive rates with renewable options

Data Sovereignty

Physical and logical isolation compliant with local regulations

Rapid Deployment

Pre-built infrastructure ready for your hardware within 90 days

Get Started

Audit Your Capacity

Share your requirements. We respond within one business day.